From: Pulling Together the Pieces of the stormwater Puzzle
Terminal 6 Porous Pavement Project Benefits
Terminal 6 Porous Pavement Project Benefits
- 100% onsite stormwater management through porous pavement system and vegetated swales
- Shortened design/construction and permitting process
- Lower annual operating costs, lower maintenance costs, and reduced stormwater fees
- Improved stormwater quality with groundwater recharge
- Reduced impact on storm surge in adjacent waterways
- In warm weather, allows stormwater to cool before entering the river
- $250,000 in cost savings from reducing permitting requirements and eliminating stormwater system
 |
| Highlighted areas show the two phases of work for the T6 project. |
Advertisement
September 2007
From: Pulling Together the Pieces of the stormwater Puzzle
Terminal 6 Porous Pavement Project Benefits
Terminal 6 Porous Pavement Project Benefits |
- 100% onsite stormwater management through porous pavement system and vegetated swales
- Shortened design/construction and permitting process
- Lower annual operating costs, lower maintenance costs, and reduced stormwater fees
- Improved stormwater quality with groundwater recharge
- Reduced impact on storm surge in adjacent waterways
- In warm weather, allows stormwater to cool before entering the river
- $250,000 in cost savings from reducing permitting requirements and eliminating stormwater system
 |
| Highlighted areas show the two phases of work for the T6 project. |
|